Skip to content

cli: Enable starting REPL. #487

cli: Enable starting REPL.

cli: Enable starting REPL. #487

Triggered via push August 5, 2025 10:21
Status Failure
Total duration 22s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
docs
Process completed with exit code 1.
test (3.12)
Process completed with exit code 1.
lint
Process completed with exit code 1.
test (3.11)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_12" failed
test (3.13)
Process completed with exit code 1.
test (3.13)
The strategy configuration was canceled because "test._3_12" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_12" failed