Skip to content

Bump ch.qos.logback:logback-core from 1.2.13 to 1.5.19 #938

Bump ch.qos.logback:logback-core from 1.2.13 to 1.5.19

Bump ch.qos.logback:logback-core from 1.2.13 to 1.5.19 #938

Status Failure
Total duration 2m 23s
Artifacts

maven.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

23 errors
build (21, ubuntu-latest)
Process completed with exit code 1.
build (17, ubuntu-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (17, ubuntu-latest)
Process completed with exit code 1.
build (8, ubuntu-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (8, ubuntu-latest)
The operation was canceled.
build (24, ubuntu-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (24, ubuntu-latest)
The operation was canceled.
build (21, windows-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (21, windows-latest)
The operation was canceled.
build (17, windows-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (17, windows-latest)
The operation was canceled.
build (8, windows-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (8, windows-latest)
The operation was canceled.
build (24, windows-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (24, windows-latest)
The operation was canceled.
build (17, macos-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (17, macos-latest)
The operation was canceled.
build (21, macos-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (21, macos-latest)
The operation was canceled.
build (8, macos-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (8, macos-latest)
The operation was canceled.
build (24, macos-latest)
The strategy configuration was canceled because "build._21_ubuntu-latest" failed
build (24, macos-latest)
The operation was canceled.